U CENTER 2 AT A GLANCE

56

Charging stations

1.232 kW

Installed capacity

Bucharest

Romania

~10 MWh

Avg. monthly energy for charging

~700

Charging sessions per month

Up to 45

Peak simultaneous sessions

Zero

Outages reported

FULL CASE STUDY

Get the complete U Center 2 case study

The full case study covers every technical detail of this deployment - from challenge to results. Fill in the form and we'll send it straight to your inbox.

Multi-level load management architecture
BMS-integrated dynamic power allocation
Tenant grouping and billing workflows
Full operational results and signals